CONTROL MONUMENT INFORMATION FRANKLIN COUNTY, FLORIDA RECORDED 4/30/84 IN "CCCL BOOK, PAGES 1-19", IN THE PUBLIC RECORDS OF FRANKLIN COUNTY, FLORIDA. THE COORINATES FOR CONTROL MONUMENTATION FOR THIS COUNTY WERE OBTAINED FROM THE METES AND BOUNDS DESCRIPTION FOR THE COASTAL CONTRUCTION CONTROL LINE, FRANKLIN COUNTY, FLORIDA AND IS FOR INFORMATION PURPOSES ONLY. THE DEPARTMENT OF ENVIRONMENTAL PROTECTION SHALL NOT BE HELD LIABLE FOR ANY USE THEREOF. FACTUAL INFORMATION MUST BE OBTAINED FROM THE RECORD PLAT OF THE FLORIDA COASTAL CONSTRUCTION CONTROL LINE RECORDED IN THE OFFICE OF THE CLERK OF THE CIRCUIT COURT OF THIS COUNTY. FOR MONUMENTS ESTABLISHED BY THE DEPARTMENT OF NATURAL RESOURCES, STATE OF FLORIDA, OR REFERRED TO BY STATION NAME FOR MONUMENTS ESTABLISHED BY THE NATIONAL GEODETIC SURVEY (N.G.S.), SAID PERMANENT REFERENCE MONUMENTS ARE ESTABLISHED IN THE NORTH ZONE OF THE STATE OF FLORIDA PLANE COORDINATE SYSTEM. ALL STATIONS IN THIS DESCRIPTION ARE BASED UPON THE NORTH AMERICAN 1927 DATUM. ELEVATIONS ARE UNADJUSTED FIELD ELEVATIONS IN THE NATIONAL GEODETIC VERTICAL DATUM (NGVD) OF 1929 AND PROVIDED FOR INFORMATION PURPOSES ONLY. NORTH AMERICAN 1927 DATUM FLORIDA LAMBERT NORTH ZONE STATION Y X SOURCE ------------------------------- ---------- ------------ ------- ST. GEORGE LIGHTHOUSE ECC. 1934 214,034.89 1,826,102.81 G-2042 CEDAR 1934 235,814.66 1,866,620.01 G-2042 GEORGE 1934 276,632.91 1,935,360.69 G-2042 DOG ISLAND WEST 1934 285,391.43 1,946,393.46 G-2042 DOG 1934 299,648.05 1,974,468.03 G-2042 PENN 1935 329,093.04 2,024,381.97 G-5045 CAPE 1935 1980 327,226.95 2,048,719.02 G-2112 HIGHWAY 1935 353,393.31 2,036,751.62 G-5045 THE FRANKLIN COUNTY COASTAL CONSTRUCTION CONTROL LINE LEGAL DESCRIPTION REFERS TO THE FOLLOWING PERMANENT REFERENCE MONUMENTS (P.R.M.). STATION Y X Z _________ __________ ____________ ______ 49-80-A01 227,677.48 1,810,707.48 10.16 49-80-A02 226,827.00 1,811,113.30 6.52 49-80-A03 224,880.18 1,813,738.78 19.27 49-80-A04 222,134.03 1,817,978.06 12.57 49-80-A05 220,178.31 1,820,150.61 26.05 49-80-A06 216,685.24 1,823,164.48 12.57 49-80-A07 216,939.76 1,823,669.16 9.83 49-80-A08 215,724.09 1,824,673.83 11.24 49-80-A09 214,835.22 1,825,261.27 7.31 49-80-A10 214,646.26 1,828,927.78 14.08 49-80-A11 215,638.61 1,832,043.65 21.40 49-80-A11 RM1 22.26 49-80-A12 216,553.28 1,834,706.21 10.31 49-80-A13 217,486.49 1,837,587.11 8.26 49-80-A14 218,530.98 1,841,223.35 14.28 49-80-A15 219,746.07 1,844,124.39 6.87 49-80-A16 221,154.98 1,848,632.46 13.39 49-80-A17 223,138.11 1,853,321.13 14.38 49-80-B01 223,672.32 1,854,668.97 14.68 49-80-B01 RM1 13.92 49-80-B02 225,227.39 1,857,769.78 10.40 49-80-B02 RM1 9.98 49-80-B02 RM2 9.33 49-80-B02A 226,134.02 1,859,443.31 13.09 49-80-B02A RM1 11.62 49-80-B02A RM2 10.54 49-80-B03 227,282.15 1,861,546.90 20.19 49-80-B03 RM1 18.96 49-80-B03 RM2 17.75 49-80-B04 229,341.77 1,864,782.23 23.61 49-80-B04 RM1 22.08 49-80-B04 RM2 20.88 49-80-B05 232,047.07 1,868,927.98 23.32 49-80-B05 RM1 22.79 49-80-B05 RM2 26.77 49-80-B06 232,519.90 1,869,877.34 22.21 49-80-B06 RM1 20.02 49-80-B07 234,304.26 1,872,293.71 23.56 49-80-B07 RM1 23.50 49-80-B07 RM2 22.38 49-80-B08 235,847.85 1,874,681.42 11.46 49-80-B08 RM1 11.74 49-80-B08 RM2 11.42 49-80-B09 236,602.80 1,875,497.99 8.68 49-80-B09 RM1 9.06 49-80-B09 RM2 9.33 49-80-B10 238,066.99 1,877,823.15 8.38 49-80-B10 RM1 9.09 49-80-B10 RM2 8.79 49-80-B11 239,060.79 1,879,983.78 9.38 49-80-B11 RM1 10.18 49-80-B11 RM2 10.30 49-80-B12 240,781.52 1,883,421.59 12.76 49-80-B12 RM1 13.74 49-80-B12 RM2 14.26 49-80-B13 242,094.41 1,886,539.15 12.79 49-80-B13 RM1 13.61 49-80-B13 RM2 12.80 49-80-B14 243,485.66 1,889,942.08 9.10 49-80-B14 RM1 10.73 49-80-B14 RM2 9.00 49-80-B15 244,692.84 1,893,543.11 10.05 49-80-B15 RM1 10.87 49-80-B16 245,479.30 1,896,358.34 10.24 49-80-B16 RM1 14.59 49-80-B16 RM2 14.42 49-80-B17 245,984.68 1,898,592.91 16.81 49-80-B17 RM2 16.81 49-80-B18 247,445.99 1,902,126.41 5.04 49-80-B18 RM1 7.40 49-80-B18 RM2 7.30 49-80-B19 248,775.04 1,905,628.38 4.27 49-80-B19 RM1 4.03 49-80-B19 RM2 4.89 49-80-B20 250,546.92 1,909,184.33 10.89 49-80-B20 RM2 13.31 49-80-B21 253,010.14 1,913,531.29 10.03 49-80-B21 RM1 11.40 49-80-B21 RM2 9.67 49-80-B22 254,329.01 1,915,130.14 14.78 49-80-B22 RM1 15.30 49-80-B22 RM2 14.17 49-80-B23 256,487.81 1,917,274.71 16.92 49-80-B23 RM1 17.32 49-80-B23 RM2 15.65 49-80-B24 258,300.42 1,919,205.94 12.08 49-80-B24 RM1 11.03 49-80-B24 RM2 11.20 49-80-B25 259,961.81 1,920,858.83 11.10 49-80-B25 RM1 14.23 49-80-B26 263,205.42 1,924,118.13 13.55 49-80-B26 RM1 12.44 49-80-B26 RM2 11.94 49-80-B27 265,401.32 1,926,576.88 7.98 49-80-B27 RM1 8.26 49-80-B27 RM2 7.26 49-80-B28 266,900.24 1,928,312.78 7.69 49-80-B28 RM1 8.56 49-80-B28 RM2 8.75 49-80-B29 268,563.66 1,929,885.80 8.57 49-80-B29 RM1 7.70 49-80-B29 RM2 8.26 49-80-B30 270,721.92 1,931,788.82 12.99 49-80-B30 RM2 11.39 49-80-B31 272,114.94 1,932,953.86 13.05 49-80-B31 RM1 13.04 49-80-B31 RM2 12.26 49-80-B32 274,337.30 1,934,954.95 8.87 49-80-B32 RM1 9.39 49-80-B32 RM2 9.94 49-80-B33 275,957.66 1,936,666.97 11.14 49-80-B33 RM2 10.45 49-80-B34 279,165.33 1,937,626.30 8.17 49-80-B34 RM1 9.07 49-80-C01 285,054.55 1,945,258.01 6.67 49-80-C01 RM1 5.03 49-80-C01 RM2 7.17 E 283,717.59 1,946,580.89 49-80-C02 283,480.06 1,947,391.82 13.17 49-80-C02 RM1 15.44 49-80-C02 RM2 15.30 49-80-C03 283,990.19 1,951,046.61 8.82 49-80-C03 RM1 9.08 49-80-C03 RM2 8.34 49-80-C04 284,879.49 1,953,883.82 8.87 49-80-C04 RM1 7.73 49-80-C04 RM2 5.25 49-80-C05 285,636.21 1,956,752.91 7.84 49-80-C05 RM1 5.48 49-80-C05 RM2 5.75 49-80-C06 287,211.97 1,961,042.75 9.18 49-80-C06 RM1 6.78 49-80-C06 RM2 4.57 49-80-C07 287,693.10 1,962,451.38 16.68 49-80-C07 RM1 15.08 49-80-C07 RM2 15.45 49-80-C08 288,809.29 1,964,559.73 25.90 49-80-C08 RM1 26.38 49-80-C08 RM2 27.20 49-80-C09 289,741.13 1,966,183.44 20.04 49-80-C09 RM1 20.40 49-80-C09 RM2 20.18 49-80-C10 290,427.00 1,967,020.92 8.24 49-80-C10 RM1 9.14 49-80-C10 RM2 9.30 49-80-C11 291,376.20 1,969,320.72 12.39 49-80-C11 RM1 11.51 49-80-C11 RM2 13.07 49-80-C12 292,570.28 1,971,651.95 7.20 49-80-C12 RM1 6.14 49-80-C12 RM2 7.15 49-80-C13 293,281.79 1,973,929.64 14.71 49-80-C13 RM1 11.23 49-80-C14 294,673.81 1,975,579.75 6.14 49-80-C14 RM1 4.79 49-80-C14 RM2 5.74 49-80-C15 297,410.65 1,976,576.71 11.52 49-80-C15 RM1 11.03 49-80-C15 RM2 11.08 49-80-C16 299,386.08 1,976,743.81 4.93 49-80-C16 RM1 6.00 49-80-C16 RM2 5.65 49-80-D01 328,639.76 2,024,937.27 3.96 49-80-D01 RM1 4.88 49-80-D01 RM2 4.46 49-80-D02 328,461.95 2,026,144.08 5.08 49-80-D02 RM1 6.15 49-80-D02 RM2 5.77 49-80-D03 328,365.12 2,029,125.43 4.41 49-80-D03 RM1 5.05 49-80-D03 RM2 4.52 49-80-D04 327,791.23 2,030,676.19 6.78 49-80-D04 RM1 7.36 49-80-D04 RM2 7.08 49-80-D05 327,567.51 2,031,969.30 5.86 49-80-D05 RM1 5.77 49-80-D05 RM2 4.24 49-80-D06 327,158.82 2,032,548.45 12.18 49-80-D06 RM1 13.59 49-80-D06 RM2 13.36 49-80-D07 325,673.95 2,036,966.37 11.13 49-80-D07 RM1 11.99 49-80-D07 RM2 11.70 49-80-D08 325,535.87 2,038,493.87 8.73 49-80-D08 RM1 8.63 49-80-D08 RM2 8.88 49-80-D09 324,987.00 2,040,015.27 9.13 49-80-D09A 325,374.38 2,041,098.88 8.20 49-80-D09 RM1 10.17 49-80-D09 RM2 10.57 49-80-D10 325,935.06 2,042,670.16 8.57 49-80-D10 RM1 8.34 49-80-D10 RM2 8.31 49-80-D11 326,547.44 2,045,285.99 10.91 49-80-D11 RM1 9.55 49-80-D12 326,473.05 2,047,846.77 7.24 49-80-D12 RM1 8.25 49-80-D12 RM2 8.12 49-80-D13 326,903.77 2,049,048.64 7.88 49-80-D13 RM1 8.67 49-80-D13 RM2 7.40 49-80-D14 327,616.42 2,049,804.68 6.80 49-80-D14 RM1 6.98 49-80-D14 RM2 7.25 49-80-D15 328,467.14 2,050,325.15 7.81 49-80-D15 RM1 9.42 49-80-D15 RM2 7.99 49-80-D16 330,012.01 2,050,890.58 6.23 49-80-D17 334,444.91 2,052,263.44 10.13 49-80-D17 RM1 10.36 49-80-D18 338,032.93 2,052,138.29 12.70 49-80-D18 RM1 10.66 49-80-D19 339,905.83 2,051,697.95 12.32 49-80-D19 RM2 11.66 49-80-D20 342,312.44 2,051,142.84 6.41 49-80-D20 RM1 6.14 49-80-D21 344,203.59 2,050,365.20 4.61 49-80-D21 RM1 4.93 U340 4.16 X340 5.66 B340 15.76 A340 7.14 D340 10.40 E340 10.00 G340 7.30 Y340 4.00 J340 5.04 P340 7.26 K340 6.26 Q340 5.97 M340 4.95 N340 6.13 A341 5.32