CONTROL MONUMENT INFORMATION BREVARD COUNTY, FLORIDA RECORDED DEC. 4, 1986, IN "SURVEY BOOK 2A, PAGES 29-42" IN THE PUBLIC RECORDS OF BREVARD COUNTY, FLORIDA. THE COORINATES FOR CONTROL MONUMENTATION FOR THIS COUNTY WERE OBTAINED FROM THE METES AND BOUNDS DESCRIPTION FOR THE COASTAL CONTRUCTION CONTROL LINE, BREVARD COUNTY, FLORIDA AND IS FOR INFORMATION PURPOSES ONLY. THE DEPARTMENT OF ENVIRONMENTAL PROTECTION SHALL NOT BE HELD LIABLE FOR ANY USE THEREOF. FACTUAL INFORMATION MUST BE OBTAINED FROM THE RECORD PLAT OF THE FLORIDA COASTAL CONSTRUCTION CONTROL LINE RECORDED IN THE OFFICE OF THE CLERK OF THE CIRCUIT COURT OF THIS COUNTY. FOR MONUMENTS ESTABLISHED BY THE DEPARTMENT OF NATURAL RESOURCES, STATE OF FLORIDA, OR REFERRED TO BY STATION NAME FOR MONUMENTS ESTABLISHED BY THE NATIONAL GEODETIC SURVEY (N.G.S.) OR BY PAN AMERICAN WORLD AIRWAYS (P.A.A.)., SAID PERMANENT REFERENCE MONUMENTS ARE ESTABLISHED IN THE EAST ZONE OF THE STATE OF FLORIDA PLANE COORDINATE SYSTEM. ALL STATIONS IN THIS DESCRIPTION ARE BASED UPON THE NORTH AMERICAN 1927 DATUM. ELEVATIONS ARE UNADJUSTED FIELD ELEVATIONS IN THE NATIONAL GEODETIC VERTICAL DATUM (NGVD) OF 1929 AND PROVIDED FOR INFORMATION PURPOSES ONLY. NORTH AMERICAN 1927 DATUM FLORIDA MERCATOR EAST ZONE STATION Y X SOURCE ----------- ------------- ------------ --------- PORTERAL 1957 1,481,223.81 629,432.89 G-12467 TECH 1961 1,415,110.89 628,797.14 G-12467 DOLITE 2 1966 1,351,035.74 645,499.99 G-12467 SHORT 3 1948 1,327,501.58 655,722.82 G-12467 SLIP 1930 1,291,763.51 673,835.78 G-3040 PAN AMERICAN WORLD AIRWAYS STATIONS POSE 1966 1,460,500.99 626,614.64 JLR 532 1965 1,402,973.68 630,515.22 THE BREVARD COUNTY COASTAL CONSTRUCION CONTROL LINE LEGAL DESCRIPTION REFERS TO THE FOLLOWING PERMANENT REFERENCE MONUMENTS (P.R.M.) STATION Y X Z _________ ____________ __________ _____ 70-80-A01 1,480,990.69 631,263.92 70-80-A02 1,479,424.95 631,080.46 8.00 70-80-A02 RM 1 9.11 70-80-A02 RM 2 9.35 70-80-A03 1,475,619.56 629,752.26 9.30 70-80-A03 RM 1 7.74 70-80-A03 RM 2 7.36 70-80-A04 1,474,942.01 629,126.17 7.47 70-80-A04 RM 1 7.47 70-80-A04 RM 2 7.62 70-80-A05 1,472,330.11 628,374.28 8.89 70-80-A05 RM 1 9.12 70-80-A05 RM 2 9.18 70-80-A06 1,468,826.46 627,549.74 9.58 70-80-A06 RM 1 9.69 70-80-A06 RM 2 10.07 70-80-A07 1,466,786.55 627,153.47 9.34 70-80-A07 RM 1 9.34 70-80-A07 RM 2 9.74 70-80-A08 1,465,303.51 627,166.10 10.10 70-80-A08 RM 1 9.97 70-80-A08 RM 2 10.06 70-80-A09 1,461,515.75 626,569.75 11.70 70-80-A09 RM 1 11.39 70-80-A09 RM 2 11.98 70-80-A10 1,460,674.74 625,792.56 11.18 70-80-A10 RM 1 11.30 70-80-A10 RM 2 11.33 70-80-A11 1,457,267.06 625,426.15 6.95 70-80-A11 RM 1 7.27 70-80-A11 RM 2 7.18 70-80-A12 1,452,721.85 625,169.14 7.31 70-80-A12 RM 1 6.60 70-80-A12 RM 2 6.72 70-80-A13 1,450,436.60 625,804.75 11.46 70-80-A13 RM 1 11.45 70-80-A13 RM 2 11.26 70-80-A14 1,447,625.90 625,739.38 11.61 70-80-A14 RM 1 11.71 70-80-A14 RM 2 11.53 70-80-A15 1,443,993.95 625,840.23 13.98 70-80-A15 RM 1 13.10 70-80-A15 RM 2 11.40 70-80-A16 1,440,020.64 625,970.36 10.51 70-80-A16 RM 1 11.03 70-80-A16 RM 2 11.77 70-80-A17 1,437,660.22 626,035.71 11.52 70-80-A17 RM 1 10.33 70-80-A17 RM 2 11.04 70-80-A18 1,435,402.68 626,282.26 10.15 70-80-A18 RM 1 9.78 70-80-A18 RM 2 10.46 70-85-A19-2 1,431,551.59 626,468.97 5.80 70-80-A19 RM 1 6.86 70-80-A19 RM 2 5.76 70-80-A20 1,427,741.61 627,050.52 13.65 70-80-A20 RM 2 13.46 70-85-A21-2 1,424,049.60 627,614.64 13.56 70-80-A21 RM 1 13.32 70-80-A21 RM 2 13.69 70-80-A22 1,419,892.71 628,210.53 13.46 70-80-A22 RM 1 13.80 70-80-A23 1,416,492.26 628,534.29 10.55 70-80-A23 RM 1 10.00 70-80-A23 RM 2 9.87 TECH 1961 1,415,110.89 628,797.14 8.26 70-80-A24 1,412,980.21 629,055.64 9.54 70-80-A24 RM 1 9.03 70-80-A25 1,410,131.76 629,387.65 9.88 70-80-A25 RM 1 9.98 70-80-A25 RM 2 9.01 70-80-A26 1,406,489.06 629,923.11 16.14 70-80-A26 RM 1 15.88 70-80-A26 RM 2 15.85 JLR 532 1965 1,402,973.68 630,515.22 70-80-A27-1985 1,400,669.88 631,007.61 15.03 70-80-A27 RM 1 15.00 70-80-A27 RM 2 14.24 70-80-A28 1,397,388.33 631,692.00 14.55 70-80-A28 RM 1 14.53 70-80-A28 RM 2 14.76 70-80-A29-1985 1,394,377.25 632,479.46 15.30 70-80-A29 RM 1 14.38 70-80-A29 RM 2 14.80 70-80-A30 1,390,749.33 633,218.95 15.93 70-80-A30 RM 1 16.50 70-80-A30 RM 2 15.63 70-80-A31 1,385,533.53 634,414.75 16.12 70-80-A31 RM 2 15.86 70-80-A32-1985 1,382,514.85 635,102.58 16.34 70-80-A32 RM 1 16.22 70-80-A32 RM 2 16.41 70-80-A33 1,379,460.32 635,777.00 15.80 70-80-A33 RM 1 15.38 70-80-A33 RM 2 15.34 70-80-A34 1,376,308.73 636,595.14 15.60 70-80-A34 RM 1 14.06 70-80-A35 1,373,896.51 637,258.50 14.92 70-80-A35 RM 1 12.93 70-80-A35 RM 2 13.34 70-80-A36 1,370,182.72 638,377.56 14.99 70-80-A36 RM 1 15.06 70-80-A36 RM 2 14.27 70-80-A37 1,367,526.28 639,192.82 13.86 70-80-A37 RM 1 13.86 70-80-A37 RM 2 13.61 70-80-A38 1,366,102.67 639,568.60 14.90 70-80-A38 RM 1 15.01 70-80-A38 RM 2 14.84 70-85-A39-2 1,363,175.62 640,563.57 15.30 70-80-A39 RM 1 15.96 70-80-A39 RM 2 15.94 70-80-A40 1,360,650.96 641,554.79 15.37 70-80-A40 RM 1 15.10 70-80-A40 RM 2 15.81 70-80-A41 1,357,620.45 641,546.42 11.30 70-80-A41 RM 1 11.84 70-80-A41 RM 2 11.56 70-80-A42 1,357,620.69 642,770.68 16.24 70-80-A42 RM 1 17.28 70-80-A42 RM 2 16.42 70-80-A43-2 1,355,294.38 643,627.49 14.79 70-80-A43 RM 1 14.89 70-80-A43 RM 2 14.32 70-80-A44 1,351,342.06 645,232.92 16.21 70-80-A44 RM 1 15.73 70-80-A44 RM 2 15.70 70-85-A45-2 1,349,217.19 646,107.49 16.51 70-80-A45 RM 1 17.14 70-80-A45 RM 2 16.69 70-85-A46-2 1,345,625.90 647,563.80 16.83 70-80-A46 RM 1 16.14 70-80-A46 RM 2 16.73 70-85-A47-2 1,342,864.33 648,748.76 17.71 70-80-A47 RM 1 17.52 70-80-A47 RM 2 17.19 70-80-A48 1,339,044.71 650,352.95 13.74 70-80-A48 RM 1 14.58 70-80-A48 RM 2 13.83 70-80-A49 1,335,347.21 652,014.49 19.47 70-80-A50 1,332,801.47 653,091.70 17.13 70-80-A50 RM 1 15.62 70-80-A50 RM 2 15.56 70-80-A51 1,329,618.70 654,707.81 18.35 70-80-A51 RM 1 17.31 70-80-A51 RM 2 17.41 70-80-A52 1,327,988.89 655,435.03 17.37 70-80-A52 RM 1 16.22 70-80-A52 RM 2 16.94 70-80-A53 1,324,759.62 656,898.21 13.08 70-80-A53 RM 1 13.41 70-80-A53 RM 2 13.71 70-80-A54 1,322,464.93 657,941.60 14.21 70-80-A54 RM 1 14.17 70-80-A54 RM 2 14.31 70-80-A55 1,321,134.34 658,421.81 11.94 70-80-A55 RM 1 12.34 70-80-A56 1,318,223.24 659,865.92 11.49 70-80-A56 RM 1 12.01 70-80-A56 RM 2 11.33 70-80-A57 1,315,385.72 661,314.08 11.95 70-80-A57 RM 1 10.74 70-80-A57 RM 2 11.64 70-80-A58 1,312,739.12 662,745.22 12.19 70-80-A58 RM 1 12.39 70-80-A58 RM 2 12.65 70-80-A59 1,308,635.21 664,834.55 12.66 70-80-A59 RM 1 12.65 70-80-A59 RM 2 11.14 70-80-A60 1,305,644.18 666,354.59 11.57 70-80-A60 RM 1 10.40 70-80-A61 1,301,473.86 668,518.58 12.93 70-80-A61 RM 1 13.65 70-80-A61 RM 2 13.29 70-80-A62 1,297,716.00 670,354.28 10.12 70-80-A62 RM 1 10.57 70-80-A63 1,294,592.36 672,006.56 12.76 70-80-A63 RM 1 12.92 70-80-A63 RM 2 12.60 88-78-A01 1,291,467.24 673,742.15 13.10 88-78-A02 1,287,747.05 675,571.03 4.77 88-78-A03 1,282,853.03 677,779.39 21.05 C 133 15.00 M 205 15.39 C 206 6.61 U 205 11.56 N 133 11.65 V 132 11.68 F 206 15.19 V 205 7.11 T 132 12.32 SEA 12.14 BOULD 12.14 H 206 12.44 JLR 532 12.44 U 230 15.04 T 230 10.23 X 229 14.34 E 304 12.59 F 304 16.79 X 167 14.23 Y 167 14.17 ANT 2 18.48 DOLITE 2 17.09 G 304 17.02 H 304 15.85 J 304 18.68 K 304 15.51 SHORT 3 17.68 L 304 13.49 M 304 13.14 N 304 12.11 P 304 12.07 Z 304 10.97 A 305 10.89 T 304 14.51 U 304 9.83 S 304 15.69