CONTROL MONUMENT INFORMATION SARASOTA COUNTY, FLORIDA RECORDED 3/2/89 IN O.R. BOOK #2102, PAGE 2632-2650, CONTROL LINE BOOK 2 IN THE PUBLIC RECORDS OF SARASOTA COUNTY, FLORIDA. THE COORINATES FOR CONTROL MONUMENTATION FOR THIS COUNTY WERE OBTAINED FROM THE METES AND BOUNDS DESCRIPTION FOR THE COASTAL CONTRUCTION CONTROL LINE, SARASOTA COUNTY, FLORIDA AND IS FOR INFORMATION PURPOSES ONLY. THE DEPARTMENT OF ENVIRONMENTAL PROTECTION SHALL NOT BE HELD LIABLE FOR ANY USE THEREOF. FACTUAL INFORMATION MUST BE OBTAINED FROM THE RECORD PLAT OF THE FLORIDA COASTAL CONSTRUCTION CONTROL LINE RECORDED IN THE OFFICE OF THE CLERK OF THE CIRCUIT COURT OF THIS COUNTY. MONUMENTS ESTABLISHED BY THE DEPARTMENT OF NATURAL RESOURCES, STATE OF FLORIDA, OR REFERRED TO BY STATION NAME FOR MONUMENTS ESTABLISHED BY NATIONAL GEODETIC SURVEY (N.G.S.), SAID PERMANENT REFERENCE MONUMENTS ARE ESTABLISHED ON THE WEST ZONE OF THE STATE OF FLORIDA PLANE COORDINATE SYSTEM. ALL STATIONS IN THIS DESCRIPTION ARE BASED ON 1979 ADJUSTMENT OF NORTH AMERICAN 1927 DATUM. ELEVATIONS ARE UNADJUSTED FIELD ELEVATIONS IN THE NATIONAL GEODETIC VERTICAL DATUM (NGVD) OF 1929 AND PROVIDED FOR INFORMATION PURPOSES ONLY. NORTH AMERICAN 1927 DATUM FLORIDA MERCATOR WEST ZONE STATION Y X SOURCE _______________ _____________ ___________ _______ MARIA 1934 1,143,284.73 271,853.76 15126 ROCKS 2 1935 1,057,414.55 326,754.24 14831 VENICE 1934 1,006,278.49 350,403.08 14831 THE SARASOTA COUNTY COASTAL CONSTRUCTION CONTROL LINE LEGAL DESCRIPTION REFERS TO THE FOLLOWING PERMANENT REFERENCE MONUMENTS (P.R.M.) STATION Y X Z _____________ ____________ __________ _____ 17-84-A01 1,111,115.24 291,965.34 7.33 17-84-A01 RM1 7.44 17-84-A01 RM2 7.02 17-84-A02 1,110,228.30 292,193.32 10.43 17-84-A02 RM1 10.63 17-84-A03 1,108,136.94 293,202.32 9.90 17-84-A03 RM1 10.91 17-84-A03 RM2 9.96 17-84-A04 1,106,266.96 294,521.06 6.24 17-84-A04 RM1 5.84 17-84-A04 RM2 6.45 17-84-A05 1,102,974.17 296,660.37 6.12 17-84-A05 RM1 5.08 17-84-A05 RM2 5.22 17-84-A06 1,101,935.72 298,006.42 4.67 17-84-A06 RM1 4.65 17-84-A06 RM2 4.94 17-84-A07 1,100,190.12 299,472.56 7.75 17-84-A07 RM1 7.42 17-84-A07 RM2 8.17 17-84-A08 1,097,653.12 301,933.16 10.59 17-84-A08 RM1 10.83 17-84-A08 RM2 10.74 17-84-A09 1,095,415.87 304,098.88 8.12 17-84-A09 RM1 7.79 17-84-A09 RM2 7.87 17-84-A10 1,093,306.09 306,050.36 4.31 17-84-A10 RM1 4.27 17-84-A10 RM2 4.13 17-84-A11 1,091,717.47 309,501.25 5.63 17-84-A11 RM1 4.38 17-84-A11 RM2 4.15 17-84-A12 1,090,381.42 308,563.39 4.30 17-84-A12 RM1 4.58 17-84-A12 RM2 4.16 17-84-A13 1,089,443.36 308,979.37 5.68 17-84-A13 RM1 6.40 17-84-A13 RM2 5.43 17-84-A14 1,088,228.68 309,211.31 3.21 17-84-A15 1,087,714.32 309,632.31 5.98 17-84-A15 RM1 6.27 17-84-A15 RM2 5.42 17-84-A16 1,086,639.24 311,591.76 10.42 17-84-A16 RM1 10.41 17-84-A16 RM2 11.06 17-84-A17 1,085,247.20 312,431.48 3.35 17-84-A17 RM1 3.40 17-84-A17 RM2 3.27 17-84-A18 1,084,352.84 311,295.87 5.80 17-84-A18 RM1 5.69 17-84-A18 RM2 5.69 17-84-A19 1,083,321.16 312,187.12 5.16 17-84-A19 RM1 5.11 17-84-A20 1,082,089.32 313,629.24 4.91 17-84-A20 RM1 4.37 17-84-A20 RM2 4.68 17-84-A21 1,080,817.32 314,606.59 3.33 17-84-A21 RM1 3.38 17-84-A21 RM2 3.43 17-84-A21A 3.92 17-84-A22 1,079,286.75 315,000.1 5.01 17-84-A22 RM1 5.23 17-84-A22 RM2 5.77 17-84-A23 1,078,107.22 316,224.72 4.56 17-84-A23 RM1 3.63 17-84-A24 1,072,322.88 316,216.02 4.52 17-84-A24 RM1 4.36 17-84-A24 RM2 4.47 17-84-A24A 4.86 17-84-A25 1,070,512.76 316,658.83 4.74 17-84-A25 RM1 5.12 17-84-A25 RM2 5.55 17-84-A26 1,068,690.10 316,615.79 4.68 17-84-A26 RM1 4.96 17-84-A26 RM2 5.01 17-84-A27 1,067,635.60 318,360.06 4.30 17-84-A27 RM1 4.49 17-84-A27 RM2 4.35 17-84-A28 1,066,781.60 319,382.89 6.27 17-84-A28 RM1 5.28 17-84-A28 RM2 6.29 17-84-A29 1,066,546.88 320,337.54 5.59 17-84-A29 RM1 6.02 17-84-A29 RM2 6.34 17-84-A30 1,066,475.46 322,523.21 7.18 17-84-A30 RM1 7.59 17-84-A30 RM2 6.40 17-84-A31 1,065,867.67 323,450.00 7.75 17-84-A31 RM1 7.69 17-84-A31 RM2 7.95 17-84-A32 1,064,169.07 324,608.63 6.72 17-84-A32 RM1 6.89 17-84-A32 RM2 7.09 17-84-A33 1,062,603.32 325,439.68 7.01 17-84-A33 RM1 6.38 17-84-A33 RM2 7.31 17-84-A34 1,060,853.97 326,019.82 5.10 17-84-A34 RM1 5.59 17-84-A34 RM2 5.40 17-84-A35 1,058,923.76 327,508.79 5.56 17-84-A35 RM1 5.32 17-84-A35 RM2 5.07 17-84-A35A 3.97 17-84-A35B 5.75 17-84-A35C 5.43 ROCKS 2 1935 1,057,414.55 326,754.24 10.50 17-84-B01 1,057,448.77 327,017.21 3.65 17-84-B02 1,057,087.41 326,951.65 6.34 17-84-B02 RM1 6.33 17-84-B03 1,050,694.12 331,109.86 9.13 17-84-B03A 4.44 17-84-B03B 4.91 17-84-B04 1,049,278.56 332,465.71 5.60 17-84-B04 RM1 5.23 17-84-B04 RM2 4.95 17-84-B05 1,046,520.94 333,413.41 5.44 17-84-B05 RM1 3.83 17-84-B05 RM2 3.82 17-84-B06 1,045,913.04 333,679.22 3.08 17-84-B06 RM1 3.16 17-84-B06 RM2 3.23 17-84-B07 1,044,309.29 334,243.34 3.70 17-84-B07A 4.90 17-84-B08 1,040,130.90 335,815.01 8.34 17-84-B08 RM1 10.94 17-84-B08 RM2 8.71 17-84-B09 1,037,417.62 336,910.53 10.28 17-84-B09 RM1 10.48 17-84-B09A 10.71 17-84-B09B 10.73 17-84-B09C 7.57 17-84-B09D 10.85 17-84-B09E 9.83 17-84-B09F 9.22 17-84-B09G 9.76 17-84-B09H 9.70 17-84-B09J 9.11 17-84-B09K 9.34 17-84-B10 1,032,017.49 338,902.80 8.92 17-84-B10 RM1 9.02 17-84-B11 1,029,406.52 340,542.18 11.69 17-84-B11A 8.66 17-84-B11B 7.19 17-84-B12 1,024,375.04 343,335.35 13.52 17-84-B13 1,023,344.71 343,866.20 14.60 17-84-B13 RM1 13.93 17-84-B13 RM2 14.35 17-84-B13A 13.44 17-84-B13B 13.77 17-84-B14 1,018,245.56 345,951.28 9.14 17-84-B14 RM1 10.50 17-84-B14A 7.78 17-84-B15 1,014,187.65 347,119.43 6.44 17-84-B15 RM1 7.43 17-84-B15A 10.76 17-84-B16 1,010,343.37 347,142.43 5.79 17-84-B17 1,006,314.42 349,999.82 7.91 VENICE 1934 1969 1,006,278.49 350,403.08 14.51 17-84-C01 1,003,874.35 350,686.38 10.52 17-84-C01 RM1 10.55 17-84-C02 1,001,840.44 351,156.03 6.24 17-84-C02 RM1 8.67 17-84-C02 RM2 6.54 17-84-C03 998,682.48 352,351.79 9.30 17-84-C03 RM1 9.42 17-84-C04 995,816.92 353,263.95 11.60 17-84-C04A 5.79 17-84-C05 991,285.10 355,020.33 9.91 17-84-C05 RM1 8.09 17-84-C06 989,351.59 356,078.86 9.28 17-84-C06 RM1 9.08 17-84-C07 987,690.05 357,072.80 11.20 17-84-C07 RM1 9.88 17-84-C07A 9.35 17-84-C07B 9.64 17-84-C08 985,748.97 358,509.43 12.74 17-84-C08 RM1 10.77 17-84-C08 RM2 8.51 17-84-C09 984,718.17 358,888.64 12.11 17-84-C09 RM1 12.42 17-84-C10 982,597.80 360,246.44 11.82 17-84-C10A 9.92 17-84-C11 979,918.24 361,822.37 12.34 17-84-C11A 9.11 17-84-C12 977,324.69 363,301.67 11.07 17-84-C12A 6.19 17-84-C13 972,776.87 365,746.79 15.43 17-84-C13A 10.61 17-84-C13B 6.94 17-84-C13C 970,966.00 366,868.64 8.32 17-84-C13D 4.27 B7-84-C13E 968,446.47 367,956.68 5.05 17-84-C13F 4.72 17-84-C14 966,394.33 368,872.01 5.32 17-84-C14 RM1 5.36 17-84-C14 RM2 6.00 17-84-C15 964,802.94 369,794.94 2.78 17-84-C15 RM1 3.14 17-84-C15 RM2 4.40 17-84-C15A 8.64 17-84-C15B 6.89 17-84-C16 961,740.63 371,044.25 8.56 17-84-C16 RM1 8.13 17-84-C16 RM2 8.74 17-84-C17 960,131.88 371,915.90 4.22 17-84-C17 RM1 5.87 17-84-C17 RM2 5.73 17-84-C18 959,095.52 372,619.06 5.65 17-84-C18 RM1 5.25 17-84-C18 RM2 5.72 17-84-C18A 3.47 17-84-C18B 8.62 17-84-C19 954,415.41 375,369.39 9.60 17-84-C19A 5.74 17-84-C20 952,853.09 376,261.15 12.20 17-84-C20A 9.88 17-84-C21 949,542.68 378,058.76 12.37 5809F NGS 1977 11.07 W92 1942 11.67 M252 1965 14.61 5858 A 77 9.19 5858 B 77 11.66 5858 C 77 13.95 5943 H 83 8.30 BM 26 4.03 BM 27 4.92 BM 28 3.36 BM 29 6.67 SAR 8 1983 BSM 11.68 SAR 17 10.42 SARA CO. 108 7.18 SARA CO. 166 13.54 6-1 (USE) 7-14-76 5.27 6-2 (USE) 7-14-76 5.38 6-2 (USE) 9-9-76 3.49 6-5 (USE) 76 3.47 6-6 (USE) 76 4.83 NEW PASS BP2 1985 4.97 NEW PASS BP4 1985 5.45 PL 10C 4.75 SABE 12 4.63 SABE 13 5.34 SABE 31 7.53 SABE 32 8.09 SABE 45 79 5.48 SABE 46 7.66 SABE 47 6.33 SABE 64 3.52