For projects NOT related to a single-family residence
For Mitigation Bank Permits (to create a mitigation bank), read Mitigation Bank Help first.
For Mines, contact the DEP Mining, Mitigation, and Delineation Program first.
All other project types, see below.
How to Apply
There are two ways to apply for an Individual or Conceptual Approval Permit.
1. Electronic Application
The DEP encourages applicants to use our electronic application website to apply for Individual or Conceptual Approval Permits. A $100 application fee discount will be given to applicants who apply online.
Go to our ERP e-Permitting website to fill out and submit your application.
The website allows you to save your progress and come back later. The application fee will depend on the size of your project and the activities you want to do. See Application Fees for a fee chart. You can pay online with a credit card or electronic check.
2. Paper Application
To submit a paper application, fill out each Joint Application section as indicated in the table below. Online help is available as listed, and contains detailed instructions and explanations that will help you submit a complete application. The links below will take you directly to the help section you need. You may also use the Table of Contents to the left of this window to navigate to different help sections if you wish.
| Fill Out These Sections | Online Help Tools | For Which Projects? |
| Section A (pdf) General Information for All Activities Form 62-330.060(1) (Word version) |
|
All projects |
| Section C (pdf) Supplemental Information for Works or Other Activities In, On, or Over Wetlands and/or Other Surface Waters Form 62-330.060(1) (Word version) |
|
Projects that include impacts to wetlands and/or other surface waters |
| Section D (pdf) Supplemental Information for Works or Activities Within Surface Waters Form 62-330.060(1) (Word version) |
|
Projects that include boating facilities, a marina, jetty, reef, or dredging. |
| Section E (pdf) Supplemental Information Required for Works or Other Activities Involving a Stormwater Management System Form 62-330.060(1) (Word version) |
|
Projects that include construction of a stormwater management system. |
| Section F (pdf) Application for Authorization to Use State-owned Submerged Lands Form 62-330.060(1) (Word version) |
|
All projects in, on, or over water. Examples include docks, piers, boat ramps, floating structures, and shoreline stabilization. |
Applicant's Handbook and Rule 62-330, F.A.C.
References to Applicant's Handbook Volume I and Volume II and Rule 62-330, F.A.C. are located throughout the application forms. Use these links and links in the online help to access these resources whenever necessary.
The Applicant's Handbook offers more detailed information regarding the rules of the district than the online help tools. The online help tools are intended to serve as a guide and to simplify the application process for applicants, but they do not replace the information in the handbook and rule.
Fees
See Application Fees to determine the appropriate review fee for your application based on project size and water management district where your project is located.
Where Do I Send the Completed Application?
Send a copy of the completed application with original signatures and the correct review fee to your nearest DEP district office.
Make checks payable to: Florida Department of Environmental Protection.
Processing
For more information about how your permit will be processed, and the timelines for processing see the help document "Permit Processing" and read the information for Individual Permits.
Other Forms
Before Construction
At least 48 hours before beginning construction, the applicant must file Form 62-330.350(1) - Construction Commencement Notice with DEP. This form may be mailed or e-mailed, and does not require a fee.
After Construction
Within 30 days of completion of construction, the applicant must file with DEP, Form 62-330.310(1) - As-Built Certification and Request for Conversion to Operation Phase. This certification notifies DEP that the system is ready for inspection.
DEP will review the form, schedule an inspection as needed, determine compliance with the provisions of Applicant's Handbook Volume I, and respond to the applicant as to acceptance or rejection of the request to convert the permit from the construction to the operation and maintenance phase. The permittee will remain liable for compliance with the terms of the permit for the life of the project, unless the permit is transferred in accordance with Rule 62-330.340, F.A.C. (See "Permit Transfer, below).
Permit Transfer
To transfer the permit to a new property owner
Use Form 62-330.340(1) - Request to Transfer Permit. Send the form to the Agency that issued the permit, along with the appropriate fee (see Application Fees).
To transfer the permit to the perpetual operation entity after the construction phase
Form 62-330.310(2) - Request for Transfer of Environmental Resource Permit to the Perpetual Operation Entity can be completed at the same time as, or within 30 days of approval of the As-Built Certification and Request for Conversion to Operation Phase.
Operation and Maintenance Inspections and Annual Reports
Form 62-330.311(2) - Operation and Maintenance Inspection Certification should be submitted within 30 days of completion of the inspection after any failure of a stormwater management system, or to document inspections required under Section 12.4 of Applicant's Handbook Volume I.
In accordance with Section 62-330.311(3), F.A.C., the operation and maintenance entity of a regional stormwater management facility must complete Form 62-330.311(3) - Regional Stormwater Management System Annual Report and submit it to the Agency on an annual basis.
Need More Help?
If you have general questions regarding your project or application, call your nearest DEP district office, and ask to speak to a permit processor.
If you need more in-depth help, or would like an experienced person to help fill out the application, submit correct information and negotiate permitting issues for you, DEP recommends that you hire the services of an experienced environmental professional. These can usually be found in the phone book under "Environmental Consultants", or other similar search terms.