DEP Application Fees

If you are submitting your application to a Water Management District (WMD), contact your local WMD office for their fee schedules.

If you withdraw an application for an Individual or Conceptual Approval permit and re-apply within 1 year, the previous application fee may be carried over to the new application.

 

This is a listing of the most common application fees, if your project type is not listed see Chapter 62-4, F.A.C. for a complete fee listing.

 

If your project falls under two or more Environmental Resource Permit (ERP) categories, the fees are not added together - only the highest fee will apply. If your project also requires state-owned (sovereign) submerged lands (SSL) authorization, you must pay the ERP application fee AND the SSL review fee. Send a check for the correct amount with your Environmental Resource Permit Application. Make the check for ERP application fees payable to the Florida Department of Environmental Protection. Make the check for SSL review fees to the Division of State Lands.

 

Reduced fees:

 

Activity

Fee

Exemption Verifications  
  • Activities qualifying for and using an agency's electronic self-certification
$0
$100
$0
General Permits (GP's) (see list of GPs)  
  • Verification of qualification to use a General Permit, except
    • Activities qualifying for and using an agency's electronic self-certification ($0)
    • Environmental enhancement and restoration by the US Army Corps of Engineers (Rule 62-330.630, F.A.C.) ($0)
    • 10/2 Stormwater General Permit under Section 403.814(12), F.S. ($0)
$250
Individual or Conceptual Approval Permits, excluding mitigation banks  
  1. Total project area of less than 10 acres and less than 1 acre of works in, on, or over wetlands and other surface waters, and less than 10 new boat slips
$420
  1. Exceeds at least one threshold in 1, above, but total project area is less than 40 acres, less than 3 acres of works in, on, or over wetlands and other surface waters, and less than 30 new boat slips
$1,500
  1. Exceeds at least one threshold in 2, above, but total project area is less than 100 acres, less than 10 acres of works in, on, or over wetlands and other surface waters, and less than 50 new boat slips
$5,000
  1. Exceeds at least one threshold in 3, above, but total project area is less than 640 acres, and less than 50 acres of works in, on, or over wetlands and other surface waters
$9,000
  1. Exceeds any threshold in 4, above
$14,000
  • Project is solely for environmental restoration or enhancement, provided such activities are not associated with a mitigation bank and are not being implemented as mitigation for other activities that require a permit under part IV of Chapter 373, F.S.
$250
  • Project is solely to retrofit an existing stormwater management system or to add treatment to and reduce stormwater pollutant loadings from an existing stormwater management system
$250
  • Individual Permit to construct, alter, maintain or operate a project that is consistent with a valid Conceptual Approval Permit
50% of the fee otherwise required for an Individual Permit, but not below the minimum required processing fee of $250
Minor modifications to an Individual, Conceptual Approval, or Mitigation Bank Permit (does not exceed thresholds in 62-330.315(3), F.A.C.)  
  • Extension of permit duration, where not exempt from payment of fees under Florida Statutes
$80
  • To correct minor errors that do not involve technical review
$0
  • To transfer ownership of a permit or to transfer the permit to an operation and maintenance entity
$0
  • All other minor modifications
$250
Major modifications to an Individual or Conceptual Approval Permit, excluding mitigation banks  
Same fee as for new permit for the same activity
Mitigation Banks  
  • New mitigation bank application
$6,050
  • Major modification affecting one of the following: the service area, credit assessment, success or release criteria, hydrologic structures or alterations, elimination of lands, monitoring or management plans, or construction or mitigation design that does not increase the project area
$1,340
  • Major modification affecting two of the following: the service area, credit assessment, success or release criteria, hydrologic structures or alterations, elimination of lands, monitoring or management plans, or construction or mitigation design that does not increase the project area
$2,680
  • Major modification affecting three of the following: the service area, credit assessment, success or release criteria, hydrologic structures or alterations, elimination of lands, monitoring or management plans, or construction or mitigation design that does not increase the project area
$4,020
  • All other major modifications
$6,050
  • Credit release
$330
  • Credit withdrawal
$0

Variances

 
$0
$170

Determinations of the Landward Extent of Wetlands and Other Surface Waters

 
  • Request for an Informal Determination
    • 1 acre or less

$100

  • Request for an Informal Determination
    • More than 1 acre

$100 for the first acre, plus $50 for each additional acre or portion of an acre (example: 2.75 acres = $200), not to exceed $500

  • Petition for Formal Determination
    • Less than 10 acres
$780
  • Petition for Formal Determination
    • Between 10 acres and less than 40 acres
$1,060
  • Petition for Formal Determination
    • Between 40 acres and 100 acres
$2,110
  • Petition for Formal Determination
    • More than 100 acres
$2,110 for the first 100 acres, then $290 for each additional 100 acres or portion of 100 acres (example: 250 acres = $2,690)
$350
Applications for Authorization to Use State-owned (Sovereign) Submerged Lands (SSL)  
Letter of Consent $0
Lease - Standard Lease, initial or renewal
  • Private residential single family dock or pier
$246
Lease - Standard Lease, initial or renewal
  • All other facilities
$619
Public or Private Easement $619
Public or Private Easement to install telecommunication lines and associated conduits $19,538.63
Use Agreement - for geophysical testing involving incidental crossings $619
Use Agreement - for geophysical testing in offshore waters $800
Oil and Gas Lease $246
Notes about SSL Authorization fees:
  • The above fees are review fees only. Additional fees will be assessed for leases or easements based on the size of the lease or easement.  Additional fees will be assessed for any removal of material from state-owned submerged lands (dredging) based on value of material and other considerations. Any additional fees will be assessed during the review process and must be paid before authorization is granted.
  • Fee amounts will be adjusted annually based on the average change in the Consumer Price Index, with a 10% cap on any annual increase.
  • SSL Authorization fees must be paid in addition to any ERP application review fees.
  • Explanation of SSL fees can be found in Rule 18-21, F.A.C.